Beranda

Jumlah OPD 45 Selengkapnya
Jumlah Sub Kegiatan 44/ 1,470 Selengkapnya
Jumlah Paket 53/ 2,282 Selengkapnya
Jumlah Konstruksi 0/ 5 Selengkapnya

Laporan Rekapitulasi Bulanan

1 Januari 2025 sampai dengan 17 Juni 2025

Pekerjaan

Sub Kegiatan Selesai 0% 0/44
Paket Selesai 0% 0/53
Konstruksi Selesai 0% 0/0

Struktur Anggaran (BKPSDM)

BELANJA
Rp15.484.298.500,00 / 86%
Pegawai
Rp1.941.810.000,00 / 91%
Non Pegawai
Rp13.542.488.500,00 / 85%
Barang/Jasa
Rp13.473.605.500,00 / 85%
Modal
Rp68.883.000,00 / 83%

Struktur Sub Kegiatan (BKPSDM)

  • Jumlah 44
  • Selesai 0
  • Tidak Selesai 0
  • Berjalan 31
  • Belum Berjalan 13

Struktur Sumber Anggaran (BKPSDM)

  • APBD
    Rp27.673.636.595,00 / 123%

Laporan Bulanan Fisik (BKPSDM)

Laporan Bulanan Keuangan (BKPSDM)

Rangking Pelaporan OPD

Total 45 hasil
#OPDPagu AnggaranPagu SerapanNilai KontrakRealisasi Progres LaporanJumlah Sub Kegiatan#####Realisasi Laporan Bulan
1KECAMATAN CIOMASRp2.636.000.000,00Rp1.267.592.812,00Rp0,0048%110010Bulan 6
2KECAMATAN KRAMATWATURp6.710.483.685,00Rp3.064.381.092,00Rp0,0046%232300158Bulan 6
3BAPPERIDARp15.358.868.217,00Rp6.251.812.638,00Rp0,0041%6666005412Bulan 6
4KECAMATAN PETIRRp3.480.484.160,00Rp1.389.542.630,00Rp0,0040%191900118Bulan 6
5KECAMATAN TUNJUNG TEJARp3.040.875.633,00Rp1.198.675.222,00Rp0,0039%16165056Bulan 6
6KECAMATAN PULO AMPELRp3.090.690.634,00Rp1.205.990.734,00Rp0,0039%222200148Bulan 6
7KECAMATAN BOJONEGARARp3.257.299.866,00Rp1.233.741.469,00Rp0,0038%141400104Bulan 6
8KECAMATAN KOPORp3.265.797.795,00Rp1.179.744.879,00Rp0,0036%773013Bulan 6
9BPBDRp17.758.169.735,00Rp6.295.265.768,00Rp0,0035%3434002212Bulan 6
10BAPENDARp59.989.984.211,00Rp20.182.247.683,00Rp0,0034%3636002412Bulan 6
11DISNAKERTRANSRp9.745.856.404,00Rp3.070.053.531,00Rp0,0032%3838001127Bulan 6
12BKPSDMRp27.673.636.595,00Rp5.408.353.361,00Rp0,0020%4444003113Bulan 6
13DPRKPRp33.411.205.235,00Rp4.323.997.656,00Rp0,0013%393920307Bulan 6
14KECAMATAN CARENANGRp2.983.484.794,00Rp1.139.216.579,00Rp0,0038%161600106Bulan 5
15KECAMATAN BANDUNGRp3.288.787.830,00Rp1.237.678.683,00Rp0,0038%191900118Bulan 5
16KECAMATAN TIRTAYASARp4.429.731.000,00Rp1.497.538.433,00Rp0,0034%262610178Bulan 5
17KECAMATAN BINUANGRp3.529.468.586,00Rp1.136.366.784,00Rp0,0032%222200148Bulan 5
18DISKOPERINDAGRp16.949.365.047,00Rp5.194.561.356,00Rp0,0031%4848003117Bulan 5
19DISHUBRp43.906.498.155,00Rp12.375.225.449,00Rp0,0028%404000373Bulan 5
20DPMDRp28.957.104.294,00Rp5.722.273.966,00Rp0,0020%3939002514Bulan 5
21DKBPPPARp11.114.252.916,00Rp1.736.744.692,00Rp0,0016%3131001318Bulan 4
22SETDARp80.964.204.138,00Rp24.727.951.793,00Rp0,0031%555500523Bulan 3
23DPMPTSPRp14.339.156.033,00Rp2.636.929.053,00Rp0,0018%3737001324Bulan 3
24KECAMATAN LEBAK WANGIRp3.606.678.242,00Rp88.524.344,00Rp0,002%202000119Bulan 1
25KESBANGPOLRp52.652.993.200,00Rp47.304.825.142,00Rp0,0090%323200257Bulan 6
26DKPPRp33.211.811.573,00Rp11.881.444.931,00Rp0,0036%4747002522Bulan 6
27DISDIKBUDRp1.186.913.517.524,00Rp333.621.325.791,00Rp0,0028%9292003458Bulan 6
28DISKOMINFOSATIKRp20.088.732.108,00Rp4.887.533.696,00Rp0,0024%4545002520Bulan 6
29SETWANRp94.489.614.278,00Rp119.828.152,00Rp0,000%484800444Bulan 6
30DISPORAPARRp14.483.382.223,00Rp5.698.140.307,00Rp0,0039%5151002526Bulan 5
31DLHRp35.888.066.300,00Rp11.982.612.296,00Rp0,0033%5454003321Bulan 5
32INSPEKTORATRp25.338.452.326,00Rp7.720.293.812,00Rp0,0030%3434001816Bulan 4
33DINKESRp265.660.188.487,00Rp32.546.906.077,00Rp0,0012%676700760Bulan 3
34KECAMATAN CINANGKARp4.923.881.531,00Rp52.894.488,00Rp0,001%191900415Bulan 3
35DPKDRp21.356.651.477,00Rp112.969.122,00Rp0,001%393900138Bulan 1
36KECAMATAN BAROSRp912.000.000,00Rp0,00Rp0,000%110001Belum Berjalan
37DISKANRp14.135.363.777,00Rp0,00Rp0,000%303000030Belum Berjalan
38DPUPRRp158.215.981.022,00Rp0,00Rp0,000%797900079Belum Berjalan
39BPKADRp19.920.777.426,00Rp0,00Rp0,000%141400014Belum Berjalan
40DISDUKCAPILRp20.866.476.084,00Rp0,00Rp0,000%262600026Belum Berjalan
41KECAMATAN TANARARp4.141.327.512,00Rp0,00Rp0,000%212100021Belum Berjalan
42KECAMATAN CIKEUSALRp3.230.227.256,00Rp1.352.673.842,00Rp0,0042%16168044Bulan 6
43KECAMATAN PONTANGRp4.788.698.728,00Rp1.746.324.824,00Rp0,0036%212116014Bulan 6
44RSDPRp354.846.540.730,00Rp115.934.894.512,00Rp0,0033%442011Bulan 6
45KECAMATAN CIRUASRp5.857.499.476,00Rp1.294.265.223,00Rp0,0022%18183069Bulan 3

Kegiatan Terakhir Ditambah (BKPSDM)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
31BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp20.935.000,00
32BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp270.000.000,00
33BKPSDMPengembangan Kompetensi TeknisRp435.000.000,00
34BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp1.700.250,00
35BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp16.500.000,00
36BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp138.460.000,00
37BKPSDMPENGEMBANGAN KOMPETENSI ASNRp321.409.000,00
38BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp6.000.000,00
39BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp4.500.000,00
40BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp12.000.000,00

Kegiatan Terakhir Diubah (BKPSDM)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
31BKPSDMPENGEMBANGAN KOMPETENSI ASNRp18.500.000,00
32BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp12.000.000,00
33BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp8.196.359,00
34BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp138.460.000,00
35BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp16.500.000,00
36BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp1.700.250,00
37BKPSDMPengembangan Kompetensi TeknisRp435.000.000,00
38BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp270.000.000,00
39BKPSDMADMINISTRASI UMUM PERANGKAT DAERAHRp16.522.000,00
40BKPSDMADMINISTRASI UMUM PERANGKAT DAERAHRp128.240.000,00