Beranda

Jumlah OPD 48 Selengkapnya
Jumlah Sub Kegiatan 44/ 1,659 Selengkapnya
Jumlah Paket 53/ 2,337 Selengkapnya
Jumlah Konstruksi 0/ 5 Selengkapnya

Laporan Rekapitulasi Bulanan

1 Januari 2025 sampai dengan 7 Agustus 2025

Pekerjaan

Sub Kegiatan Selesai 0% 0/44
Paket Selesai 0% 0/53
Konstruksi Selesai 0% 0/0

Struktur Anggaran (BKPSDM)

BELANJA
Rp15.484.298.500,00 / 86%
Pegawai
Rp1.941.810.000,00 / 91%
Non Pegawai
Rp13.542.488.500,00 / 85%
Barang/Jasa
Rp13.473.605.500,00 / 85%
Modal
Rp68.883.000,00 / 83%

Struktur Sub Kegiatan (BKPSDM)

  • Jumlah 44
  • Selesai 0
  • Tidak Selesai 0
  • Berjalan 33
  • Belum Berjalan 11

Struktur Sumber Anggaran (BKPSDM)

  • APBD
    Rp27.673.636.595,00 / 123%

Laporan Bulanan Fisik (BKPSDM)

Laporan Bulanan Keuangan (BKPSDM)

Rangking Pelaporan OPD

Total 48 hasil
#OPDPagu AnggaranPagu SerapanNilai KontrakRealisasi Progres LaporanJumlah Sub Kegiatan#####Realisasi Laporan Bulan
1BAPENDARp59.989.984.211,00Rp30.792.627.816,00Rp0,0051%363600315Bulan 8
2SETWANRp116.443.176.326,00Rp48.710.695.243,00Rp0,0042%5858004018Bulan 8
3DISKOMINFOSATIKRp20.088.732.108,00Rp7.378.844.192,00Rp0,0037%4545003015Bulan 8
4KESBANGPOLRp52.652.993.200,00Rp49.541.491.730,00Rp0,0094%323200284Bulan 7
5BAPPERIDARp15.358.868.217,00Rp8.772.905.104,00Rp0,0057%666600588Bulan 7
6KECAMATAN TUNJUNG TEJARp3.040.875.633,00Rp1.726.649.183,00Rp0,0057%16165056Bulan 7
7KECAMATAN KRAMATWATURp6.710.483.685,00Rp3.776.540.230,00Rp0,0056%232300167Bulan 7
8KECAMATAN PULO AMPELRp3.090.690.634,00Rp1.595.365.667,00Rp0,0052%222200157Bulan 7
9DISDUKCAPILRp20.582.687.800,00Rp10.305.754.765,00Rp0,0050%2626001214Bulan 7
10KECAMATAN TIRTAYASARp4.429.731.000,00Rp2.217.960.953,00Rp0,0050%262610196Bulan 7
11KECAMATAN BOJONEGARARp3.411.829.666,00Rp1.708.000.578,00Rp0,0050%202000146Bulan 7
12DLHRp35.193.241.220,00Rp16.903.059.535,00Rp0,0048%5454004410Bulan 7
13KECAMATAN BINUANGRp3.529.468.586,00Rp1.687.906.300,00Rp0,0048%222200175Bulan 7
14BPBDRp17.705.792.935,00Rp8.319.974.316,00Rp0,0047%3434002311Bulan 7
15DISNAKERTRANSRp9.745.856.404,00Rp4.549.269.165,00Rp0,0047%3838002117Bulan 7
16DISHUBRp43.906.498.155,00Rp19.326.391.648,00Rp0,0044%404000391Bulan 7
17DISKOPERINDAGRp17.670.040.047,00Rp7.625.187.190,00Rp0,0043%4848003513Bulan 7
18RSDPRp354.846.540.730,00Rp151.016.098.699,00Rp0,0043%442020Bulan 7
19BKPSDMRp27.673.636.595,00Rp10.727.529.322,00Rp0,0039%4444003311Bulan 7
20DISKANRp13.632.380.689,00Rp4.932.810.893,00Rp0,0036%363600324Bulan 7
21DINKESRp403.990.950.528,00Rp138.464.901.891,00Rp0,0034%7272003834Bulan 7
22DKBPPPARp32.115.137.629,00Rp10.184.935.456,00Rp0,0032%6161004021Bulan 7
23DINSOSRp15.164.544.511,00Rp3.947.593.602,00Rp0,0026%4949001138Bulan 7
24DPRKPRp33.593.718.408,00Rp7.092.083.403,00Rp0,0021%383840313Bulan 7
25KECAMATAN PONTANGRp4.788.698.728,00Rp2.440.302.471,00Rp0,0051%212116023Bulan 6
26KECAMATAN CIKEUSALRp3.230.227.256,00Rp1.627.893.539,00Rp0,0050%16168053Bulan 6
27KECAMATAN BANDUNGRp3.288.787.830,00Rp1.644.750.712,00Rp0,0050%191900136Bulan 6
28KECAMATAN CARENANGRp2.983.484.794,00Rp1.484.590.371,00Rp0,0050%161600115Bulan 6
29KECAMATAN PETIRRp3.480.484.160,00Rp1.719.813.248,00Rp0,0049%191900118Bulan 6
30INSPEKTORATRp25.338.452.326,00Rp12.395.509.334,00Rp0,0049%3434002113Bulan 6
31DISPORAPARRp14.483.382.223,00Rp7.061.548.664,00Rp0,0049%5151003219Bulan 6
32SETDARp80.964.204.138,00Rp39.360.880.159,00Rp0,0049%555500541Bulan 6
33KECAMATAN CIOMASRp4.045.902.632,00Rp1.861.156.268,00Rp0,0046%151500123Bulan 6
34KECAMATAN CIRUASRp5.857.499.476,00Rp2.552.947.124,00Rp0,0044%18189081Bulan 6
35KECAMATAN PABUARANRp4.351.960.301,00Rp1.813.197.234,00Rp0,0042%222200139Bulan 6
36KECAMATAN LEBAK WANGIRp3.606.678.242,00Rp1.482.897.428,00Rp0,0041%202000119Bulan 6
37KECAMATAN KOPORp3.265.797.795,00Rp1.179.744.879,00Rp0,0036%773013Bulan 6
38DKPPRp33.211.811.573,00Rp11.881.444.931,00Rp0,0036%4747002522Bulan 6
39KECAMATAN TANARARp4.141.327.512,00Rp1.228.129.044,00Rp0,0030%2121001011Bulan 6
40DISDIKBUDRp1.186.913.517.524,00Rp333.621.325.791,00Rp0,0028%9292003458Bulan 6
41DPKDRp21.386.521.679,00Rp5.062.292.109,00Rp0,0024%3939202215Bulan 6
42DPMDRp28.957.104.294,00Rp6.693.503.165,00Rp0,0023%3939002613Bulan 6
43DPUPRRp158.632.874.013,00Rp32.880.340.866,00Rp0,0021%8080005129Bulan 6
44KECAMATAN CINANGKARp4.916.521.531,00Rp2.260.790.852,00Rp0,0046%191910117Bulan 3
45DPMPTSPRp14.339.156.033,00Rp2.694.711.753,00Rp0,0019%3737001918Bulan 3
46KECAMATAN CIKANDERp5.053.453.028,00Rp0,00Rp0,000%191900019Belum Berjalan
47BPKADRp701.102.355.756,00Rp0,00Rp0,000%424200042Belum Berjalan
48KECAMATAN BAROSRp912.000.000,00Rp0,00Rp0,000%110001Belum Berjalan

Kegiatan Terakhir Ditambah (BKPSDM)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp40.000.000,00
2BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp1.380.938.000,00
3BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp754.250.000,00
4BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp270.000.000,00
5BKPSDMPengembangan Kompetensi TeknisRp435.000.000,00
6BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp1.700.250,00
7BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp16.750.000,00
8BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp22.500.000,00
9BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp16.500.000,00
10BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp138.460.000,00

Kegiatan Terakhir Diubah (BKPSDM)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp236.000.000,00
2BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp191.614.500,00
3BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp12.000.000,00
4BKPSDMPENYEDIAAN JASA PENUNJANG URUSAN PEMERINTAHAN DAERAHRp196.890.000,00
5BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp8.196.359,00
6BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp20.935.000,00
7BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp4.480.000,00
8BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp42.200.000,00
9BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp138.460.000,00
10BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp16.500.000,00