Beranda

Jumlah OPD 48 Selengkapnya
Jumlah Sub Kegiatan 44/ 1,660 Selengkapnya
Jumlah Paket 53/ 2,353 Selengkapnya
Jumlah Konstruksi 0/ 5 Selengkapnya

Laporan Rekapitulasi Bulanan

1 Januari 2025 sampai dengan 23 Juli 2025

Pekerjaan

Sub Kegiatan Selesai 0% 0/44
Paket Selesai 0% 0/53
Konstruksi Selesai 0% 0/0

Struktur Anggaran (BKPSDM)

BELANJA
Rp15.484.298.500,00 / 86%
Pegawai
Rp1.941.810.000,00 / 91%
Non Pegawai
Rp13.542.488.500,00 / 85%
Barang/Jasa
Rp13.473.605.500,00 / 85%
Modal
Rp68.883.000,00 / 83%

Struktur Sub Kegiatan (BKPSDM)

  • Jumlah 44
  • Selesai 0
  • Tidak Selesai 0
  • Berjalan 33
  • Belum Berjalan 11

Struktur Sumber Anggaran (BKPSDM)

  • APBD
    Rp27.673.636.595,00 / 123%

Laporan Bulanan Fisik (BKPSDM)

Laporan Bulanan Keuangan (BKPSDM)

Rangking Pelaporan OPD

Total 48 hasil
#OPDPagu AnggaranPagu SerapanNilai KontrakRealisasi Progres LaporanJumlah Sub Kegiatan#####Realisasi Laporan Bulan
1DKBPPPARp32.115.137.629,00Rp10.184.935.456,00Rp0,0032%6161004021Bulan 7
2SETDARp80.964.204.138,00Rp39.360.880.159,00Rp0,0049%555500541Bulan 6
3KECAMATAN TIRTAYASARp4.429.731.000,00Rp1.965.841.689,00Rp0,0044%262610196Bulan 6
4KECAMATAN CIKANDERp5.053.453.028,00Rp0,00Rp0,000%191900019Belum Berjalan
5KECAMATAN PETIRRp3.480.484.160,00Rp1.719.813.248,00Rp0,0049%191900118Bulan 6
6KECAMATAN TUNJUNG TEJARp3.040.875.633,00Rp1.726.649.183,00Rp0,0057%16165056Bulan 7
7KECAMATAN KOPORp3.265.797.795,00Rp1.179.744.879,00Rp0,0036%773013Bulan 6
8KECAMATAN KRAMATWATURp6.710.483.685,00Rp3.776.540.230,00Rp0,0056%232300167Bulan 7
9KECAMATAN PULO AMPELRp3.090.690.634,00Rp1.595.365.667,00Rp0,0052%222200157Bulan 7
10KECAMATAN BOJONEGARARp3.411.829.666,00Rp1.708.000.578,00Rp0,0050%202000146Bulan 7
11RSDPRp354.846.540.730,00Rp151.016.098.699,00Rp0,0043%442020Bulan 7
12KECAMATAN PONTANGRp4.788.698.728,00Rp2.440.302.471,00Rp0,0051%212116023Bulan 6
13KECAMATAN BANDUNGRp3.288.787.830,00Rp1.644.750.712,00Rp0,0050%191900136Bulan 6
14KECAMATAN CARENANGRp2.983.484.794,00Rp1.484.590.371,00Rp0,0050%161600115Bulan 6
15KECAMATAN CIOMASRp4.045.902.632,00Rp1.861.156.268,00Rp0,0046%151500123Bulan 6
16KECAMATAN CIRUASRp5.857.499.476,00Rp2.552.947.124,00Rp0,0044%18189081Bulan 6
17KECAMATAN BINUANGRp3.529.468.586,00Rp1.482.334.178,00Rp0,0042%222200166Bulan 6
18KECAMATAN CIKEUSALRp3.230.227.256,00Rp1.352.673.842,00Rp0,0042%16168044Bulan 6
19KECAMATAN PABUARANRp4.351.960.301,00Rp1.813.197.234,00Rp0,0042%222200139Bulan 6
20KECAMATAN LEBAK WANGIRp3.606.678.242,00Rp1.482.897.428,00Rp0,0041%202000119Bulan 6
21KECAMATAN TANARARp4.141.327.512,00Rp1.228.129.044,00Rp0,0030%2121001011Bulan 6
22KECAMATAN CINANGKARp4.923.881.531,00Rp52.894.488,00Rp0,001%191900415Bulan 3
23KECAMATAN BAROSRp912.000.000,00Rp0,00Rp0,000%110001Belum Berjalan
24DKPPRp33.211.811.573,00Rp11.881.444.931,00Rp0,0036%4747002522Bulan 6
25DLHRp35.193.241.220,00Rp16.903.059.535,00Rp0,0048%5454004410Bulan 7
26KESBANGPOLRp52.652.993.200,00Rp48.696.309.798,00Rp0,0092%323200284Bulan 7
27BAPPERIDARp15.358.868.217,00Rp7.700.848.839,00Rp0,0050%666600579Bulan 7
28DISDUKCAPILRp20.582.687.800,00Rp10.305.754.765,00Rp0,0050%2626001214Bulan 7
29BAPENDARp59.989.984.211,00Rp29.454.138.456,00Rp0,0049%363600288Bulan 7
30BPBDRp17.705.792.935,00Rp8.319.974.316,00Rp0,0047%3434002311Bulan 7
31DISNAKERTRANSRp9.745.856.404,00Rp4.549.269.165,00Rp0,0047%3838002117Bulan 7
32BKPSDMRp27.673.636.595,00Rp10.727.529.322,00Rp0,0039%4444003311Bulan 7
33DISKANRp13.632.380.689,00Rp4.932.810.893,00Rp0,0036%363600324Bulan 7
34DINKESRp403.990.950.528,00Rp138.464.901.891,00Rp0,0034%7272003834Bulan 7
35SETWANRp116.443.176.326,00Rp37.987.437.624,00Rp0,0033%5858003820Bulan 7
36DISKOMINFOSATIKRp20.088.732.108,00Rp5.981.983.809,00Rp0,0030%4545002916Bulan 7
37DINSOSRp15.164.544.511,00Rp3.947.593.602,00Rp0,0026%4949001138Bulan 7
38DPKDRp21.386.521.679,00Rp4.992.367.616,00Rp0,0023%3939102315Bulan 7
39INSPEKTORATRp25.338.452.326,00Rp12.395.509.334,00Rp0,0049%3434002113Bulan 6
40DISPORAPARRp14.483.382.223,00Rp7.061.548.664,00Rp0,0049%5151003219Bulan 6
41DISKOPERINDAGRp16.949.365.047,00Rp6.919.041.835,00Rp0,0041%4848003513Bulan 6
42DISHUBRp43.906.498.155,00Rp17.104.371.190,00Rp0,0039%404000391Bulan 6
43DISDIKBUDRp1.186.913.517.524,00Rp333.621.325.791,00Rp0,0028%9292003458Bulan 6
44DPMDRp28.957.104.294,00Rp6.693.503.165,00Rp0,0023%3939002613Bulan 6
45DPUPRRp158.632.874.013,00Rp32.880.340.866,00Rp0,0021%8080005129Bulan 6
46DPRKPRp33.411.205.235,00Rp4.323.997.656,00Rp0,0013%393920307Bulan 6
47DPMPTSPRp14.339.156.033,00Rp2.694.711.753,00Rp0,0019%3737001918Bulan 3
48BPKADRp701.102.355.756,00Rp0,00Rp0,000%424200042Belum Berjalan

Kegiatan Terakhir Ditambah (BKPSDM)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp6.000.000,00
2BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp4.480.000,00
3BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp4.500.000,00
4BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp191.614.500,00
5BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp8.196.359,00
6BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp108.030.000,00
7BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp42.200.000,00
8BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp754.250.000,00
9BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp1.700.250,00
10BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp22.500.000,00

Kegiatan Terakhir Diubah (BKPSDM)

Total 10 hasil
#OPDNama KegiatanPagu Anggaran
1BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp6.000.000,00
2BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp4.480.000,00
3BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp4.500.000,00
4BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp191.614.500,00
5BKPSDMPERENCANAAN, PENGANGGARAN, DAN EVALUASI KINERJA PERANGKAT DAERAHRp8.196.359,00
6BKPSDMPENGADAAN, PEMBERHENTIAN DAN INFORMASI KEPEGAWAIAN ASNRp108.030.000,00
7BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp42.200.000,00
8BKPSDMSERTIFIKASI, KELEMBAGAAN, PENGEMBANGAN KOMPETENSI MANAJERIAL DAN FUNGSIONALRp754.250.000,00
9BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp1.700.250,00
10BKPSDMPENILAIAN DAN EVALUASI KINERJA APARATURRp22.500.000,00